Dickson Outlines Steps For 737 MAX Return To Service | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Feb 14, 2020

Dickson Outlines Steps For 737 MAX Return To Service

Airliners Have Been Grounded For 11 Months

FAA Administrator Steve Dickson said there is a "waterfall" of actions that need to be completed to return the Boeing 737 MAX to service.

Dickson (pictured) spoke to reporters on the sidelines of the Singapore Air Show this week. He said there is still no firm timetable for recertification of the beleaguered airplane or its return to flight. But he did say certifications flights are coming.

Reuters reports that Dickson said there are multiple steps that will be taken between the certification flights and a return to service, which he estimates will take about a month barring any unforeseen issues that may arise during those flight tests. Individual airline's training plans will also have to be approved by the FAA.

Among the milestones outlined by Dickson were:

  • Certification flight test by FAA pilots to evaluate the compliance of final software, revised following the crashes.
  • Analysis of flight data, expected to take “a few days”.
  • Multi-regulator Joint Operational Evaluation Board (JOEB) simulator exercises to evaluate Boeing’s training proposals. Dickson and his deputy will personally complete the training alongside U.S. and international crews. Takes 9-10 days.
  • An addendum to a Flight Standardization Board (FSB) report, which in turn defines minimum training needs. “It will take a few days to complete that,” Dickson said.
  • The result will be put out to public comment for 15 days.

After final design documentation is prepared and verified, a master Minimum Equipment List will be established after public comments that have been sought since Dec 5.

Eventually, the FAA will publish an AD advising airlines of required corrective actions, and "within a day or two" the FAA would rescind the grounding order that has been in effect since last March. The FAA will then issue airworthiness certificates for each individual airplane.

Some of the tasks will be carried out concurrently, according to Dickson.

(Image from file)

FMI: Source report

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC