Stennis Certified For Flight Operations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Wed, Dec 17, 2014

Stennis Certified For Flight Operations

Flight Deck Certification Completed Following 16 Months In Port

Nimitz-class aircraft carrier USS John C. Stennis (CVN 74) and Carrier Air Wing (CVW) 9 successfully completed flight deck certification Dec. 12, after a 16-month Docking Planned Incremental Availability period.

Representatives from each CVW9 squadron embarked Stennis Dec. 5 to perform aircraft launch and recovery operations over the course of three days.

Flight deck certification started about 120 days before this underway, said Lt. j.g. Mark Rodriguez, Stennis' flight deck officer. "We have to be certified to launch and recover aircraft by the commander of Naval Air Forces handling team prior to conducting flight operations," said Rogdiguez.
 
The certification was the first time Stennis and CVW9 have operated together since deploying in 2013. "It's been a good experience getting familiar with shipboard life again," said Aviation Boatswain's Mate (Equipment) 1st Class Wendell Ramos of Helicopter Sea Combat Squadron (HSC) 14. "It's important to build that relationship between the air wing and ship."
 
For many of Stennis' and CVW9's personnel, this underway was their first time to see flight operations. "It's scary but exciting at the same time," said Logistics Specialist Seaman Edward Mitchell, from Fayetteville, North Carolina. "There [are] propellers spinning, planes taking off and landing, things that you normally only see in movies."
 
Stennis and CVW9 performed 160 launch and recoveries during day and night operations throughout the certification process. "The purpose of flight deck certification is to make sure all the pieces fall in together," said Lt. j.g. Mark Trask, an aviator assigned to Helicopter Sea Combat Squadron (HSC) 14. "The equipment, personnel, catapults and carrier air traffic control have to be certified and ready to launch and recover aircraft in support of future air missions."

Completing flight deck qualifications brings Stennis one step closer to becoming fully combat ready.
 
ANN Salutes Mass Communication Specialist 3rd Class Jonathan Jiang, USS John C. Stennis Public Affairs

(U.S. Navy image)

FMI: www.stennis.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (06.03.25): No Gyro Approach

No Gyro Approach A radar approach/vector provided in case of a malfunctioning gyro-compass or directional gyro. Instead of providing the pilot with headings to be flown, the contro>[...]

ANN's Daily Aero-Linx (06.03.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

Airborne 05.29.25: ATC Bonu$, VX4 eVTOL Flies, Starship 9 Test

Also: Hermeus Quarterhorse MK1, Seaplane Rating Guide, Vietjet A330neos, SFO Wacky Weed Bust As the air traffic controller shortage trudges on, the US Department of Transportation >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC