FAA Dedicates New Palm Springs, CA Control Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Sep 23, 2013

FAA Dedicates New Palm Springs, CA Control Tower

Total Project Cost Was About $25 Million

The FAA and local officials on Thursday dedicated a new, environmentally friendly airport traffic control tower at Palm Springs International Airport. The tower replaces a facility that served the airport since 1967.

The new tower is 150 feet tall – two-and-a-half times the height of the old tower – and provides air traffic controllers with better sight lines, as well as a more efficient work space. It sits on top of a 7,000 square-foot base building.

“This tower is part of our commitment to maintaining the world’s safest aviation system,” said FAA Administrator Michael Huerta. “Palm Springs is a vastly different airport than it was in 1967, and this new tower will give controllers better views of planes on the airfield and approaching the airport.”

The total project cost, including construction, electronics and equipment installation, was approximately $25 million. A $13.9 million American Recovery and Reinvestment Act grant paid for the construction, which began in June 2010.

The tower project includes a host of money-saving green features, including coated glass panels that reduce radiant heat inside the controller work area, decorative rock landscaping that requires no watering, and motion sensor-controlled lighting. Additionally, the contractor will soon start building a covered parking structure with solar panels on the roof that the FAA expects will produce a significant amount of the facility’s annual electrical needs when it’s completed in late 2014.

Palm Springs International Airport serves 10 major airlines. It had about 58,000 takeoffs and landings in 2012.

FMI: www.faa.gov

Advertisement

More News

Aero-TV: DeltaHawk’s Diesel Power Steps Into the Spotlight

Its Offerings Are Lighter, Cleaner, and Now Pushing Past 1,000nm on SAF Jet Fuel DeltaHawk’s diesel-powered aircraft lineup has seen incredible upgrades over the last few yea>[...]

NTSB Prelim: Mooney Aircraft Corp. M20K

The Airplane Experienced A Total Loss Of Engine Power On December 3, 2025, about 1600 central standard time, a Mooney Aircraft Corp. M20K, N57229, was substantially damaged when it>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Linx (12.20.25)

Aero Linx: European Society of Aerospace Medicine (ESAM) As a pan-European, independent forum, it works to promote the safety and health of all persons involved in aviation and spa>[...]

Aero-News: Quote of the Day (12.20.25)

“We are excited to see Wisk achieve this milestone, and I’m so proud of the team that made it possible. The team at Wisk has built advanced technologies across flight c>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC