Last ATV Reentry Leaves Legacy For Future Space Exploration | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.02.24

Airborne-NextGen-12.03.24

Airborne-Unlimited-12.04.24

Airborne Flt Training-12.05.24

Airborne-Unlimited-12.06.24

Fri, Feb 20, 2015

Last ATV Reentry Leaves Legacy For Future Space Exploration

Final Automated Transfer Vehicle Reentered Earth's Atmosphere Monday

ESA’s fifth automated cargo ferry completed its mission to the International Space Station today when it reentered the atmosphere and burned up safely over an uninhabited area of the southern Pacific Ocean.

The end of the mission as the craft broke up as planned at about 18:04 GMT (19:04 CET) marks the end of the Automated Transfer Vehicle (ATV) program. The program has served the Station with the most complex space vehicle ever developed in Europe, achieving five launches in six years following its 2008 debut.

ATVs delivered some 70,000 pounds of supplies over the course of their five missions. They boosted the Station to raise its orbit numerous times and similarly moved it out of the way of space debris. The vehicles demonstrated European mastering of automated docking, a technology that is vital for further space exploration.

This last ATV, Georges Lemaître, set the record for the heaviest Ariane 5 launch when it climbed into space from Europe’s Spaceport in French Guiana on 29 July 2014.

Before undocking, the Station crew loaded it with waste material, freeing up space on the weightless research center. The European cargo ship undocked on 14 February at 13:40 GMT (14:40 CET) and maneuvered itself into a safe descent trajectory.

ATV was conceived in 1987, when ideas for an international space station to succeed Russia’s Mir complex were beginning to surface. In 1994, ESA and Russia discussed the possibility of using the vehicle for a new station. The decision to build it was taken in October 1995 and development began the following year.

The ATV program was part of a barter arrangement between ESA and its international partners through which ESA pays its share of the running costs of the International Space Station by supplying vital equipment and systems.

The spacecraft formed part of the Station’s supply fleet, alongside Russia’s Progress and Soyuz, Japan’s HII Transfer Vehicle and America’s Dragon and Cygnus commercial ferries.

The knowledge gained by ESA and European industry from designing, building and operating the complex ATV missions has been instrumental for ESA’s participation in NASA’s Orion spacecraft that will fly astronauts to the Moon and beyond.

ESA’s industrial partners are already building the European Service Module, ATV’s technical successor, a critical module for Orion that will supply power, air and propulsion during the test flight in 2017. “It is with a feeling of pride that we look back at our accomplishments on the ATV program,” says Thomas Reiter, Director of Human Spaceflight and Operations.

“We look forward to applying the experience and knowledge we gained from designing, building and operating five ATV spacecraft with excellent results to future exploration missions using the successor European Service Module of the Orion vehicle.”

(Image provided by ESA)

FMI: www.esa.int

Advertisement

More News

ANN's Daily Aero-Linx (12.05.24)

Aero Linx: Canadian Bushplane Heritage Centre Visit the Canadian Bushplane Heritage Centre. The only museum of its kind in Canada. A world class museum connecting people of all age>[...]

ANN's Daily Aero-Term (12.05.24): Chaff

Chaff Thin, narrow metallic reflectors of various lengths and frequency responses, used to reflect radar energy. These reflectors, when dropped from aircraft and allowed to drift d>[...]

Airborne 12.02.24: Electra FG EIS, Prez Osprey Problems, Starship Wants 25

Also: EAA Ray Foundation, MagniX Records, Ruko U11MINI Drone, RCAF PC-21s Elektra Solar recently put the first aircraft from its Elektra Trainer Fixed-Gear (FG) family into service>[...]

Airborne 11.27.24: CAP Tragedy, Gulfstream Milestone, Van Celebrates His 85th

Also: ANN/Airborne Holiday Schedule, UT NG Gets New Apaches, UK Airport Reopening, Laser v Helo A Civil Air Patrol search and rescue training flight over steep and rugged terrain e>[...]

ANN's Daily Aero-Linx (12.06.24)

Aero Linx: National Air Traffic Controllers Association (NATCA) NATCA members embrace new technology and are eager to use the most efficient and modern procedures available. First >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC