Composite 'Bubbles' Force Cancellation Of 787 Cert Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Mon, Jun 12, 2006

Composite 'Bubbles' Force Cancellation Of 787 Cert Test

Boeing Says Isolated Incident Won't Affect Schedule

We suspect structural engineers on Boeing's 787 program are working overtime on this one, after a required test for FAA certification was called off due to a possible defect in the aircraft's composite skin.

Business Week reports a 33-foot prototype section of the 787s fuselage -- which was to be used as part of an FAA test to certify the aircraft's manufacturing process -- displayed bubbles in the composite structure.

Boeing spokeswoman Yvonne Leach said the bubbles were likely caused by a leak in a pressing tool used to form the aircraft's fuselage, which allowed gases to seep into the composite material.

Over time, the bubbles could degrade and weaken the composites, which are used extensively in the 787's structure.

Despite the glitch, however, Boeing's expected 2008 certification for the Dreamliner is not likely to be affected.

"We know what happened," Mike Bair, vice president and general manager of the 787 program, told the Seattle Post-Intelligencer. "We learned some things as a result, which is part of what this whole process is about. We know what we have to do to support our certification plan."

Bair also noted the component that showed evidence of bubbling -- a central barrel section -- was one of nine that make up the 787's fuselage. Those eight other sections (including the complex nose and tail sections) showed no significant problems.

To make up time lost in the delay, Bair said the company will produce two identical components and test them concurrently.

FMI: www.boeing.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC