Gov Watchdog Publicizes Internal A-10 Thunderbolt Briefing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Sun, May 01, 2022

Gov Watchdog Publicizes Internal A-10 Thunderbolt Briefing

Another Decade, Another Underfunded CAS Asset

An 8-page internal briefing paints a bleak picture for the current A-10 Thunderbolt fleet, saying that the aircraft "lives in the shadow of 2015 divestiture decisions", and fixes to get the plane back on track "will take a decade or more to reverse." 

Pamela Lee, A-10 systems manager at Hill AFB in Salt Lake City, Utah, briefed a group on the issue in March, before her presentation was publicized by the Project on Government Oversight (POGO). The slides paint a very similar picture to the usual pastiche of A-10 operation for more than 15 years, illustrating an aircraft that is wildly popular outside Air Force leadership, but a begrudging line item they can't wait to get rid of. Congress has had to step in at least 5 times since 2014, POGO notes, adding specific provisions to the NDAA to prohibit the force from retiring aircraft or drawing back funding. They note that a series of relatively low-cost National Guard programs have proven that the old dog can be taught new tricks, with Guard Thunderbolt programs bringing out a helmet mounted targeting system, improved GPS, and 3D audio systems.

Lee's briefing, which she has insisted is for internal use only, shows the A-10 program being starved of necessary support and funding, despite previous congressional mandates. One cannot legislate enthusiasm, and despite the provisions aimed at ensuring continued A-10 service, it seems the Air Force has had little trouble hampering the program regardless. POGO points out a lack of sorely needed upgrades, like revised computing, communication, and avionics equipment that unnecessarily lengthens the A-10 kill chain. Another project, critical to continued service, is a new wing for the aircraft, as well as the reassignment of maintenance resources that created a massive backlog of repair work. POGO describes the issue as "Demolition by Neglect", pointing out that despite the dislike leadership seems to have for the A-10, they have deployed the fleet overseas numerous times in recent history. 

POGO says that the lack of maintenance and upgrades has "served to accelerate the fleet's deterioration, helping Air Force leaders make their case that the A-10 should be retired because of its poor condition. In an Ironic twist, USAF leaders actually made the case for continued relevance by showing how effectively it operated in Syria," as well as recent deployments to Europe as a show of force, both for their legendary stature as a premier CAS asset and their ability to operate from unimproved runways. 

The A-10 re-winging program, a vital one one for the 40+ year old aircraft, has been the subject of cancellations and postponements. POGO recalls that by now, the entire fleet of 281 aircraft should have received their new wings, with a $2 billion contract for 242 of them given to Boeing in 2007. A few decisions by USAF brass saw the contract lapse in 2016 after 171 wing sets had been delivered, with a second contract begun in 2019 for remaining aircraft. Lee's briefing shows that, between both contracts, only 173 wing sets have been delivered so far.

The overall picture painted of the A-10 is not a heartening one. Less than half the fleet is believed to be deployment-ready, with rumors that USAF prep instructions have been given to units to select only those aircraft with enough lifetime flight hours left on their airframe for a 6-month deployment. Assuming a 1,200 hour time between major overhaul, 145 A-10s are non-deployable. 

The report, and the briefing, are available at the  Project on Government Oversight's website, with a bevy of extra details that grant a deeper look into the goings-on of the beloved aircraft program.

FMI: www.pogo.org

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC