V-22s Grounded: Hydraulic Problems Blamed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Mar 06, 2003

V-22s Grounded: Hydraulic Problems Blamed

The V-22 Osprey Joint Program Office and Naval Air Systems Command have directed a temporary suspension of flight operations pending the replacement of specific hydraulic lines in the engine nacelles of the five aircraft currently assigned to the flight test program.

After completing extensive quality inspections and tests, program technicians determined that several production lots of ¼-inch hydraulic lines provided by an Osprey Team supplier do not meet performance specifications. Although a single failure of any of the hydraulic lines in question would not immediately jeopardize an aircraft during flight, program officials decided to replace suspect high- and low-pressure line components that control the aircraft's swashplate actuators. That means 20 lines per aircraft will be replaced.

Replacement of these components in all flight test aircraft should be complete in about two weeks, and normal flight operations should resume around March 18-20.

Program officials will make further determinations about the need to replace suspect lines that may be used in other areas of the test aircraft as well as in aircraft currently in modification or production. Bell and Boeing technicians are currently determining the extent of these quality issues. The V-22 Joint Program Office has already initiated efforts to qualify new suppliers and the process is well under way to qualify other manufacturing sources for similar components to ensure that all hydraulic systems in the V-22 meet or exceed the program's stringent quality requirements.

FMI: www.bellhelicopter.textron.com, www.boeing.com, www.navair.mil, http://pma275.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (07.12.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (07.12.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Of the Aeropup and its Pedigree

From 2023 (YouTube Edition): Barking up the Right Tree Australian-born, the Aeropup is a remarkably robust, fully-customizable, go-anywhere, two-seat, STOL/LSA aircraft. The machin>[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC