Boeing Receives Type-Certification For Its Dreamlifter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jun 05, 2007

Boeing Receives Type-Certification For Its Dreamlifter

Four-Plane Fleet Will Be Used To Ferry 787 Assemblies To WA

Boeing announced Monday its Dreamlifter, the specially modified 747-400 used to transport the major assemblies for the 787 Dreamliner, was granted type certification on Saturday, June 2, from the US Federal Aviation Administration (FAA).

The certification recognizes the Dreamlifter has successfully passed all of the testing and safety requirements required by the FAA. The Dreamlifter does not need to be certified by other regulatory agencies.

"This certification reflects not only the safety and reliability of the Dreamlifter but also its remarkable performance," said Scott Strode, 787 vice president of Airplane Definition and Production.

As part of the flight test program, FAA officials flew on board the Dreamlifter as it delivered major sections of the Dreamliner from partner sites around the world to the Boeing factory in Everett, WA for final assembly. Boeing reports the flights allowed the FAA to validate the overall delivery process and tools.

The Dreamlifter is not certified to carry passengers beyond essential crew. The Dreamlifter completed 437 flight-test hours and 639 hours of ground testing since its first flight on September 9, 2006.

With certification achieved, operation of the Dreamlifter fleet will soon be assumed by Evergreen International Airlines (EIA) of McMinnville, OR. EIA must first complete the required New Airplane Process Document process proving it is ready to operate the aircraft. Boeing expects the transition to EIA to occur in June.

Boeing currently has two Dreamlifters in operation, with a third now under construction. Eventually, four Dreamlifters will be utilized to ferry subcontractor-assembled components of the 787 to Everett.

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC