Report: JLENS Airship Not Meeting Expectations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.17.25

AirborneUnlimited-07.11.25

Mon, Oct 26, 2015

Report: JLENS Airship Not Meeting Expectations

But Program Has Powerful Friends In Washington

An investigation conducted by a news organization has found that the Army's JLENS program has failed to meet expectations after 17 years and an investment of nearly $3 billion.

The Baltimore Sun reports that, according to an investigation by Tribune Media, the 240-foot-long white tethered blimp has failed to effectively track targets and distinguish threats from friendly aircraft. Tribune Media reports that in a review of reports generated by the U.S. GAO and the Pentagon Operational Test and Evaluation Office, the JLENS' performance was rated as "poor" in 2012, citing issues if four "critical performance areas."

The Baltimore Sun reports that the JLENS, which is designed to track low-flying aircraft, did not detect Douglas Hughes, who flew a gyrocopter through the area monitored by the JLENS and eventually landed on the West Lawn of the U.S. Capitol.

He got through, according to the Army, because software issues kept a second JLENS aircraft of the ground, and data from the aircraft has "not been integrated into the NORAD air defense network," according to Maj. Beth R. Smith.

According to the report, the Army tried to end the program in 2010, but prime contractor Raytheon and other supporters managed to salvage funding for the technology. The system was defended by Marine Corps Gen. James E. "Hoss" Cartwright, who was at the time the vice chairman of the Joint Chiefs of Staff.

Cartwright later joined the Raytheon board, and the paper reports that according to the SEC, he was paid more than $282,000 in cash and stock.

The Army says that JLENS is currently in a "testing and system checkout phase."

(Image from file)

FMI: www.army.mil

Advertisement

More News

ANN's Daily Aero-Term (07.15.25): Charted Visual Flight Procedure Approach

Charted Visual Flight Procedure Approach An approach conducted while operating on an instrument flight rules (IFR) flight plan which authorizes the pilot of an aircraft to proceed >[...]

Aero-News: Quote of the Day (07.15.25)

“When l became the Secretary of Defense, I committed to rebuild our military to match threats to capabilities. Drones are the biggest battlefield innovation in a generation, >[...]

ANN's Daily Aero-Linx (07.15.25)

Aero Linx: Stearman Restorers Association Welcome to the Stearman Restorers Association. The Stearman Restorers Association is an independent “Not for Profit” 501C-3 Co>[...]

NTSB Final Report: Kjelsrud Gary Kitfox

Airplane Exhibited A Partial Loss Of Engine Power When It Was About Halfway Down The Runway Analysis: The pilot of the experimental amateur-built airplane was departing from his pr>[...]

NTSB Prelim: Cessna A150L

The Flight Path Was Consistent With Low-Altitude Maneuvering On June 18, 2025, about 0922 mountain standard time, a Cessna A150L airplane, N6436F, was substantially damaged when it>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC