Boeing T-7A Crew Shuts Off, Restarts Engine In Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Mar 02, 2020

Boeing T-7A Crew Shuts Off, Restarts Engine In Flight

Single-Engine Jet’s In-Flight Restart Demonstrates Robust Design

Restarting a military jet’s engine in flight is a critical safety feature that can only be demonstrated by doing something a flight crew rarely wants to do: shutting off the engine in flight.

That’s all the more daunting in a single-engine aircraft. Yet, a Boeing T-7A trainer crew recently did it, at 20,000 feet above an Illinois test area, then flew the plane for 48 seconds before restarting the GE F404 engine and landing back at Boeing’s St. Louis site.  

“Engine air start testing requires a large amount of preparation, planning and teamwork,” said T-7A Chief Pilot Steve Schmidt. “It’s a test of all the subsystems built for backup in the event a pilot would have to shut the engine down in an emergency and power it back up again.”

Schmidt performed the test with fellow Boeing Pilot William Berryman. The test was the latest success for a program that’s meeting all its critical development milestones. The company expects to deliver the first T-7A Red Hawk to the U.S. Air Force in 2023.

“This is a testament not only to the confidence our pilots have in the reliability of the T-7A aircraft, but also to the team who designed, engineered and built this new trainer aircraft for the Air Force,” said Chuck Dabundo, T-7 vice president and program manager.

In September 2018, the U.S. Air Force awarded Boeing a $9.2 billion contract to supply T-7A Red Hawk aircraft and training simulators. Designed by Boeing and Saab, the T-7A has already accumulated more than 175 hours of flight time in more than 160 developmental test flights.

(Source: Boeing news release. Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC