Orion Parachute Test Goes... Ah, Not Well | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Aug 23, 2008

Orion Parachute Test Goes... Ah, Not Well

Yep, They're Gonna NEED To Fix This

A preliminary test of the parachute system designed to softly return NASA's upcoming Crew Exploration Vehicle to Earth failed in spectacular fashion last month, resulting in an Orion-sized dent in the Arizona desert landscape.

According to NASA, a test set-up parachute failed during the July 31, test of parachutes for the recovery system for the Orion. From the start, the test was in trouble... as one of the so-called "programmer" chutes failed to inflate properly. As a result, instead of falling right-side-up, the wooden capsule mock-up tumbled almost from the moment it was released from the C-17 carrier aircraft.

The troublesome chute was one of 18 parachutes used during the test... but created a domino effect, that extended to the capsule's main 'chute system when the time came for that to be deployed. Only one of the three main parachutes for the recovery system remained attached to the mock-up... and that parachute was torn and too damaged to inflate properly.

The result will be familiar to anyone who grew up watching Warner Brothers cartoons. Like the hapless Coyote, attached to the latest contrivance from ACME... the Orion mockup landed with a solid thud on the desert floor. (NASA remains mum on whether any Roadrunners were present at the time -- Ed.)

Granted, it's still early in the Orion's development cycle; the first manned flight isn't scheduled to fly until 2015. But an unmanned launch is scheduled for late-2009... and this failure is the latest in a series of stumbling points for Orion, and the beleaguered Constellation program.

In happier news: rumor has it the mockup's toilets worked perfectly...

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC