Service Schedule Changes Announced For Centurion Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, May 11, 2010

Service Schedule Changes Announced For Centurion Engines

Life Extension To 1,500 Hours Certified

Centurion is launching a 'service offensive' for the kerosene piston aircraft engines in its Centurion 2.0 series. The operational lifetime for this engine has been extended to 1,500 hours. Centurion has also arranged to bypass the 1,200 hour factory inspection. What that means for the owner is that the engines no longer have to be removed at 1,200 hours and sent back to the factory in Lichtenstein, Germany, it can now be conducted at all authorized Centurion service centers. The move will result in a significant reduction in the maintenance costs and AOG times of the aircraft, but Centurion is now looking to extend the operational lifetime to 1,800 hours for the Centurion 2.0.

"Our Lifetime Extension Program is now taking full effect. First the fuel feed pump, which is already at 1,200 hours; and now 1,500 hours for the engine and - most important - no factory inspection any longer," said Centurion CEO Jasper M. Wolffson. "For customers, this means a cost reduction in 1,200 hour service by over 7,000 Euros ($9000). Our fleet customers in particular are delighted with this progress."

The 1,200 hour maintenance interval more or less corresponds to 600-hour maintenance. In addition, it is also necessary to replace the V-ribbed belt, the oil thermostat screw plug, a number of hoses (depending on the aircraft type) and the coolant. The engine, however, no longer has to be removed and sent back to the production organization for inspection, as would have been necessary with the originally-planned factory inspection. This cuts out the cost of removing and refitting the engine along with the associated transport costs. The average labor time decreases on average from 14 down to around one hour, which means a significant reduction of the aircraft on ground (AOG) time.

With some 300 plus service centers, one of the largest service networks in General Aviation is available for Centurion engines with service centers on all continents. Centurion says over 2,600 of its engines are operating in various aircraft types, and have racked up more than 2 million flight hours.

FMI: www.centurion.aero

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC