FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Oct 14, 2010

FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost

A 700 Foot Extension Would Preserve Existing commercial Service

The FAA has told Hilton Head Island airport (KHXD) officials that any proposal to extend the runway on the resort island to less than 5,000 feet would receive a cool reception from the agency, and would be difficult to justify in terms of funding.

In a letter sent to county administrator Gary Kubic, the FAA's Scott Seritt said that an extension of less than 700 feet "would not justify the cost."

The argument is a familiar one pitting residents living near the airport against the airports' desire for a longer runway. The Island Packet reports that consultants studied extensions of 300, 700, and 1,100 feet, and some town officials have said that the 700 foot option would preserve the turboprop-based commercial service to the airport, increasing safety for those aircraft while minimizing disruptions to the surrounding residential neighborhoods. But the 5,000 foot runway would still not be sufficient for larger business jets or regional jets operated by the airlines. Regional jets would require a runway of at least 6,500 feet.

The FAA seems to be pushing Hilton Head to go for the longest option studied, a 5,400 foot runway. Seritt said in his letter that if the county does not make the longest possible extension now, the funds for such projects might not be available in the future.


KHXD

The paper reports that county administrator Kubic said the likelihood of reduced federal funding for the shortest option make it "very unlikely," and that a 5,000 foot runway seemed to be a good compromise. He said that the airport does not generate enough revenue to undertake any runway extension without the 95 percent funding offered by the FAA. State and local sources split the remaining 5 percent.

FMI: http://bcgov.net/about-beaufort-county/transportation/hhi-airport/index.php, www.faa.gov

Advertisement

More News

Aero-News: Quote of the Day (12.11.25)

"The owners envisioned something modern and distinctive, yet deeply meaningful. We collaborated closely to refine the flag design so it complemented the aircraft’s contours w>[...]

ANN's Daily Aero-Term (12.11.25): Nonradar Arrival

Nonradar Arrival An aircraft arriving at an airport without radar service or at an airport served by a radar facility and radar contact has not been established or has been termina>[...]

Classic Aero-TV: David Uhl and the Lofty Art of Aircraft Portraiture

From 2022 (YouTube Edition): Still Life with Verve David Uhl was born into a family of engineers and artists—a backdrop conducive to his gleaning a keen appreciation for the >[...]

Airborne-NextGen 12.09.25: Amazon Crash, China Rocket Accident, UAV Black Hawk

Also: Electra Goes Military, Miami Air Taxi, Hypersonics Lab, MagniX HeliStrom Amazon’s Prime Air drones are back in the spotlight after one of its newest MK30 delivery drone>[...]

Airborne 12.05.25: Thunderbird Ejects, Lost Air india 737, Dynon Update

Also: Trailblazing Aviator Betty Stewart, Wind Farm Scrutiny, Chatham Ban Overturned, Airbus Shares Dive A Thunderbird pilot, ID'ed alternately as Thunderbird 5 or Thunderbird 6, (>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC