So That's Where The Money Is... Detroit Metro Receives $15M For Runway Upgrades | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, May 15, 2009

So That's Where The Money Is... Detroit Metro Receives $15M For Runway Upgrades

Summer Project Estimated To Generate Up To 225 New Local Jobs

While we're sure that many of you have as cautionary an outlook on the stimulus package as we do, its nice to know that a solid aviation infrastructure project got a piece of it... and for a change, its not going to an airport named after John Murtha.

As many as 225 excavators, pavers, haulers, electricians and other construction workers are getting some work at Detroit Metro Airport this summer, as a result of a $15 million grant awarded to the Wayne County Airport Authority (WCAA) as part of the American Recovery and Reinvestment Act (ARRA) of 2009.

"We're eager to get started on rehabilitating this critical piece of transportation infrastructure for our region--and to put people to work," said WCAA CEO Lester Robinson.

The ARRA grant is designated to support the reconstruction of Detroit Metro Airport's Runway 9L/27R--one of two crosswind runways used primarily during strong westerly wind conditions. The $34.6 million rehabilitation project had already been scheduled to begin this summer; however, this ARRA funding enables WCAA to accelerate what would have been a two-year project to a single construction season in 2009--enhancing the short-term economic impact of the project to the region (a primary goal of ARRA).

Unlike previous runway rehabilitation projects, the accelerated 9L/27R project is expected to have minimal--if any--impact on airline operations or aircraft noise over surrounding communities. Because 9L/27R is used only during specific, infrequent wind conditions, air traffic will continue to operate as normal on the airport's four primary (parallel) runways throughout the reconstruction.

"The timing of this project is ideal for everyone, given the opportunity to accelerate the reconstruction during a summer when our airlines already anticipate operating fewer flights due to economic factors," explained Robinson.

Work on the runway reconstruction is expected to begin in early June. Runway 9R/27L is currently 8,700 feet long and 200 feet wide. The reconstructed runway will be reduced in width to 150 feet as allowed by Federal Aviation Administration (FAA) guidance in order to reduce construction costs as well as yield reduced maintenance costs and snow removal response time. Associated runway markings, electrical, and edge lighting systems will be replaced as part of the reconstruction project. The newly-rebuilt runway will have a lifespan of at least 20-years.

FMI: http://www.metroairport.com

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC