Scrubbed! Hydrogen Leak Postpones STS-127 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Sat, Jun 13, 2009

Scrubbed! Hydrogen Leak Postpones STS-127 Launch

Gaseous Hydrogen Leak Creates Launch Hazard

A gaseous hydrogen leak on a vent line for space shuttle Endeavour is postponing Saturday morning's launch of Endeavour. The official scrub time was 0026 EDT. Launch teams began draining Endeavour's external fuel tank of its liquid hydrogen and liquid oxygen at 0006.

Fueling was halted after the leak was detected near the Ground Umbilical Carrier Plate, or GUCP, which attached to the external tank at its intertank area. The line leads from the GUCP back to the launch pad and to the "flare stack" where vented gaseous hydrogen is burned off.

The leak is similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March.

After the leak is assessed, shuttle managers plan to meet Saturday morning to discuss what steps to take next, including targeting a new launch date for Endeavour's STS-127 mission to the International Space Station, though current estimates indicate that another launch attempt is at least 96 hours off.

Mission STS-127 is the 32nd flight dedicated to station construction, and the final of a series of three flights dedicated to the assembly of the Japanese Kibo laboratory complex.The STS-127 payload is the Kibo Japanese Experiment Module Exposed Facility and Experiment Logistics Module Exposed Section.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (10.14.25): Severe Icing

Severe Icing The rate of ice accumulation is such that ice protection systems fail to remove the accumulation of ice and ice accumulates in locations not normally prone to icing, s>[...]

Aero-News: Quote of the Day (10.14.25)

“...The Airmen that work on the flight line can turn around to the shelf, grab the part, put it in the airplane, and now it’s going to perhaps be several more days befo>[...]

ANN's Daily Aero-Linx (10.14.25)

Aero Linx: Alaskan Aviation Safety Foundation (AASF) Welcome to the Alaskan Aviation Safety Foundation. The foundation was created to improve aviation safety in Alaska through educ>[...]

Classic Aero-TV: Curtiss Jenny Build Wows AirVenture Crowds

From 2022 (YouTube Edition): Jenny, I’ve Got Your Number... Among the magnificent antique aircraft on display at EAA’s AirVenture 2022 was a 1918 Curtiss Jenny painstak>[...]

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 101 Aviation Nears STC Approval for Lithium Battery Upgrade on Gulf>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC