Spirit Admits To Apparent New Interruptions In 737 MAX Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Jun 12, 2020

Spirit Admits To Apparent New Interruptions In 737 MAX Production

Spirit Believes There Will Be A Reduction To Spirit's 2020 737 MAX Production Plan 

The long-awaited re-emergence of the 737MAX from FAA pergatory is going to take a bit longer... so says Boeing contractor, Spirit AeroSystems.

On June 4, 2020, Spirit reported that they received a letter from Boeing directing Spirit to pause additional work on four 737 MAX shipsets and avoid starting production on sixteen 737 MAX shipsets to be delivered in 2020, until otherwise directed by Boeing, in order to support Boeing's alignment of near-term delivery schedules to its customers' needs in light of COVID-19's impact on air travel and airline operations, and in order to mitigate the expenditure of potential unnecessary production costs.

Based on the information in the letter, subsequent correspondence from Boeing dated June 9, 2020, and Spirit's discussions with Boeing regarding 2020 737 MAX production, Spirit believes there will be a reduction to Spirit's previously disclosed 2020 737 MAX production plan of 125 shipsets. Spirit does not yet have definitive information on what the magnitude of the reduction will be but expects it will be more than 20 shipsets.

The 737 MAX grounding coupled with the COVID-19 pandemic is a challenging, dynamic and evolving situation. During this time, Spirit plans to work with Boeing to determine a definitive production plan for 2020 and manage the 737 MAX production system and supply chain," noted the company.

Due to the matters described above, Spirit has elected to place certain Wichita hourly employees directly associated with production work and support functions for the 737 MAX program on a 21 calendar day unpaid temporary layoff/furlough effective Monday, June 15. In addition, Spirit will declare an immediate reduction of the hourly workforce in Tulsa and McAlester, Okla., effective tomorrow, June 12.

FMI: www.spiritaero.com

Advertisement

More News

NTSB Final Report: Aviat A1

Airplane Bounced About 3 Ft Then Touched Back Down And Then, With No Brakes Applied, The Airplane Began Veering To The Left Analysis: The pilot entered the airport traffic pattern >[...]

ANN's Daily Aero-Linx (07.08.25)

Aero Linx: British Microlight Aircraft Association (BMAA) The primary focus within all aviation activity is SAFETY. In all aspects of our sport SAFETY must come first, whether it b>[...]

Classic Aero-TV: Fly Corvair’s Reliable Engine Alternative

From SnF25 (YouTube Edition): William Wynne Builds Practical Aircraft Engines on the Corvair Platform Seeking an affordable alternative to the traditional aircraft engine options, >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: CiES Fuel-Quantity and e-Throttle Systems Praised

From 2023 (YouTube Edition): Bridge of CiES CiES Inc. is a Bend, Oregon-based designer and manufacturer of modular embedded aircraft systems and sensors. The company’s fuel-l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC