The Dreamliner Gets Its Wings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.03.24

Airborne-NextGen-06.04.24

Airborne-Unlimited-06.05.24 Airborne-AffordableFlyers-06.06.24

Airborne-Unlimited-06.07.24

Wed, May 16, 2007

The Dreamliner Gets Its Wings

No, It Hasn't Flown Yet... We Mean Literally

The gigantic composite wings for the upcoming Boeing 787 Dreamliner were delivered to Everett early Tuesday morning, adding another piece to the assembly puzzle now underway in the Seattle suburb.

Manufactured by Mitsubishi Heavy Industries at its facility in Nagoya, Japan, each wing is 98 feet long. Standing on edge in custom-made tooling, the wings were delivered together to Boeing via the Dreamlifter, a specially modified 747-400 used to transport 787 major assemblies.

Boeing says the 787 is the first commercial aircraft to use composite materials as its primary structure. It is also the first Boeing aircraft to sport an all-composite wing.

"A composite wing of this size has never been built before," said Scott Strode, 787 vice president of Airplane Definition and Production. "This is a tribute to our fantastic team. We believe the Dreamliner sets a new standard for how commercial airplanes will be made in the future."

The wings were immediately delivered to the 787 final assembly factory in Everett. Additional work -- including attaching the wingtip and movable surfaces -- will be completed by Boeing. The total wingspan of a 787 is 197 feet.

Boeing touts the 787 Dreamliner as the fastest-selling airplane in aviation history, with firm orders for 567 airplanes from 44 airlines. The first public rollout of the plane is scheduled for July 8, 2007... and ANN will be there!

FMI: www.boeing.com

Advertisement

More News

Archer Gains Part 135 Air Carrier & Operator Certificate

With Certification In-Hand, the Story Continues Archer has been given some very good news as of late, now having been granted their operator certificate from the FAA. Even better f>[...]

Airborne 06.10.24: Gone West-Bill Anders, M700 FIKI, TFR Corrections

Also: Virgin Galactic, TBMOPA’s European Convention, B-29 Doc and B-25 Berlin Express, Fairchild XNQ-1 An astronaut who was part of what was then mankind's greatest adventure>[...]

Airborne 06.10.24: Gone West-Bill Anders, M700 FIKI, TFR Corrections

Also: Virgin Galactic, TBMOPA’s European Convention, B-29 Doc and B-25 Berlin Express, Fairchild XNQ-1 An astronaut who was part of what was then mankind's greatest adventure>[...]

Aero-News: Quote of the Day (06.11.24)

“For months, ALPA has been sounding the alarm on the ongoing efforts by some aircraft manufacturers to remove pilots from the flight deck and replace them with automation. To>[...]

FlightHorizon Chosen for Osage Nation's Skyway36 Droneport

Skyway Range Begins Planning for Traffic Early On Skyway 36 is shaping up to be a handy UAV development location, boasting a 3,000-foot runway a short hop from downtown Tulsa, Okla>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC