Boeing Elects To Conduct Inspections On 787s Before Flight Tests Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 26, 2010

Boeing Elects To Conduct Inspections On 787s Before Flight Tests Continue

"Workmanship Issues" Identified On The Dreamliners' Horizontal Stabilizers

After some very successful initial flight testing, the Dreamliner program has been dealt a bit of a setback, as Boeing recently identified a workmanship issue with the 787's horizontal stabilizers. Some airplanes apparently have issues with improperly installed shims and the torque of associated fasteners, and Boeing says the finding requires inspection of all airplanes and rework if discrepancies are found.

The company says it has already implemented inspection and rework plan for airplanes in production. For those airplanes requiring rework, Boeing says they expect it will take up to eight days for each airplane. the company says it is not unusual for these issues to arise in the course of production programs - they are identified, dispositioned and dealt with through normal processes.

Boeing insists that reports that the fleet is "grounded" are incorrect. The company has made the decision to inspect the horizontal stabilizers on all flight test airplanes before their next flights to ensure any rework is completed as quickly as possible. Inspections are expected to take one to two days.

The Seattle Times reported that the stabilizer issue was first discovered last week. Boeing spokeswoman Yvonne Leach told that paper that the planemaker "made a decision to be prudent and do the inspections" before flying again. The improperly installed shims could have led to a "lower than expected longevity" for the joints in the horizontal stabilizer. The Italian manufacturer Alenia builds the tail assembly for Boeing.

Boeing says it expects that the issue will be addressed within the existing program schedule, and that the 787 remains on track for first delivery to ANA by the end of this year.

FMI: www.boeing.com

Advertisement

More News

Aero-TV: DeltaHawk’s Diesel Power Steps Into the Spotlight

Its Offerings Are Lighter, Cleaner, and Now Pushing Past 1,000nm on SAF Jet Fuel DeltaHawk’s diesel-powered aircraft lineup has seen incredible upgrades over the last few yea>[...]

NTSB Prelim: Mooney Aircraft Corp. M20K

The Airplane Experienced A Total Loss Of Engine Power On December 3, 2025, about 1600 central standard time, a Mooney Aircraft Corp. M20K, N57229, was substantially damaged when it>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Linx (12.20.25)

Aero Linx: European Society of Aerospace Medicine (ESAM) As a pan-European, independent forum, it works to promote the safety and health of all persons involved in aviation and spa>[...]

Aero-News: Quote of the Day (12.20.25)

“We are excited to see Wisk achieve this milestone, and I’m so proud of the team that made it possible. The team at Wisk has built advanced technologies across flight c>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC