USAF Designates Two New B-21 Bases | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Sep 17, 2024

USAF Designates Two New B-21 Bases

Whiteman and Dyess AFBs Selected to Home the Bomber

Secretary of the Air Force Frank Kendall recently designated Whiteman Air Force Base in Missouri and Dyess Air Force Base in Texas as the second and third locations for the B-21 Raider. These locations will join the first base, Ellsworth AFB in South Dakota.

Ellsworth AFB was the first designated location for the bomber. It houses the formal B-21 training unit and is the first base to begin construction. The Air Force Civil Engineer Center (AFCEC) got to work building and renovating more than 20 major facilities in September 2021 and has been making steady progress since.

Whiteman Air Force Base, located in central Missouri, was selected as the second base for the B-21 Raider due to its existing infrastructure. Home to the 509th Bomb Wing, Whiteman is currently home base for the B-2 Spirit bomber and has a history of supporting advanced air combat operations. The addition of the B-21 Raider will further enhance the base’s capabilities, allowing it to support both current and next-generation bomber fleets.

Dyess Air Force Base in Abilene, Texas, will be the third B-21 base. Known for housing the 7th Bomb Wing, which currently operates the B-1B Lancer, Dyess is positioned for a range of combat operations. Dyess Air Force Base’s infrastructure and operational experience with heavy bombers allow for easy integration of the B-21.

The B-21 Raider is the U.S. Air Force’s latest stealth bomber. Its capabilities include dual nuclear and conventional strike options. Currently, the B-21 Raider is in low-rate production and undergoing flight tests, with plans to build at least a 100-aircraft fleet. It is designed for long-range missions in contested environments, providing a modernized alternative to the B-1 and B-2.

“We continue to achieve B-21 production milestones; through digital engineering and open architecture design, we are getting an agile strategic deterrent that delivers a decisive response as required,” commented Gen. Thomas Bussiere, commander of Air Force Global Strike Command.

Whiteman and Dyess Air Force Bases will be integral to the B-21’s operational readiness and deployment. Meanwhile, the Air Force will continue to modernize and maintain its current bomber fleet until the B-21 is fully operational in the mid-2020s.

FMI: www.af.mil

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC