Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

ANN's Daily Aero-Term (07.12.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (07.12.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Of the Aeropup and its Pedigree

From 2023 (YouTube Edition): Barking up the Right Tree Australian-born, the Aeropup is a remarkably robust, fully-customizable, go-anywhere, two-seat, STOL/LSA aircraft. The machin>[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC