AD: GA 8 Airvan (Pty) Ltd Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Mar 13, 2018

AD: GA 8 Airvan (Pty) Ltd Airplanes

AD NUMBER: 2018-05-08

PRODUCT: GA 8 Airvan (Pty) Ltd Models GA8 and GA8-TC320 airplanes

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2013-19-12 for the airplane listed above.

This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and address an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as the fuel system integral sump tank not meeting FAA regulations.

DATES: This AD is effective April 12, 2018.

COST: The FAA estimates that this AD will affect 47 products of U.S. registry. We also estimate that it will take about 3 work-hours per product to do fuel system ventilation and drainage modification requirement of this AD (this action is retained from AD 2013-19-12). The average labor rate is $85 per work-hour.

Based on these figures, the FAA estimates the cost of this portion of this AD on U.S. operators to be $11,985, or $255 per product.

The agency also estimates that it will take about 4 work-hours per product to do the supplementary fuel ventilation modification requirement of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $932 per product.

Based on these figures, the FAA estimates the cost of this portion of this AD on U.S. operators to be $59,784, or $1,272 per product.

In addition, the FAA estimates that it will take about 4 work-hours per product to do the cargo pod modification requirement of this AD (this action is retained from AD 2013-19-12). The average labor rate is $85 per work-hour. Required parts will cost about $1,000 per product, for a cost of $1,340 per product. There is no way of determining the number of products that may need this action.

According to the manufacturer, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. The FAA does not control warranty coverage for affected individuals. As a result, we have included all costs in our cost estimate.

FMI: AD

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC