Boeing Delays Test Flights Of CST-100 Starliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Mon, Aug 06, 2018

Boeing Delays Test Flights Of CST-100 Starliner

Cites Issues With Spacecraft's Abort Engines

Boeing will not attempt an uncrewed test flight of its CST-100 Starliner commercial crew vehicle until very late this year or early in 2019, according to the program's project manager.

In a conference call with reporters, John Mulholland said that the first manned flight for the Starliner will not happen until mid-2019 at the earliest, according to a report from SpaceNews, which did not participate in the call but obtained a recording of the session for "selected members of the media." Mulholland said that the reason for the delay is a problem with the abort engines that cropped up during a static fire test in June at NASA's White Sands Test Facility in New Mexico.

“During the startup of that test, all engines responded nominally,” Mulholland said. “At approximately one and a half seconds, we issued shutdown commands to the engines, and several of the abort engine valves failed to fully close.” That caused hypergolic propellant to leak from the engines, but did not damage the test article, he added.

“We are confident we identified the root cause and are implementing corrective actions now,” he said, not specifying what that root cause was. The corrective actions include both “minor design changes” and operational changes, he said, “that we believe will allow those valves to fully close with significant margin in all potential operational scenarios.”

Mulholland said that Boeing has also adjusted the schedule for other key tests "to optimize the program flow."

The Boeing executive said that he believes the updated schedule is "realistic", but did admit that there could be further delays."

(Image from file)

FMI: Original report

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC