Van's Issues RV-12 Service Bulletin | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Mon, Feb 28, 2022

Van's Issues RV-12 Service Bulletin

Required Fix to Strengthen Rear Tailcone Skins

Van's has issued a service bulletin for RV-12 and RV-12iS aircraft, specifically requiring owners to inspect the lower portion of the tailcone for cracks, and install stiffening equipment to bolster them should damage be found. 

Van's issued the warning after receiving reports of cracking along the lower tailcone skins of RV-12 near the tail bulkheads, observed along the centerline of the plane. Even if cracking is not evident, owners are required to install the support clips. If damage is uncovered, then an additional patch plate will need to be fabricated and installed all at once. Depending on the level of cracking present, the fix may require additional patchwork past the damaged piece, as the bulletin requires that "the patch should capture at least 3 rivets past the crack in the skin or forward and aft of the bulkhead and 2 rivets left and right of centerline." For the average experienced builder or A&P, Vans estimates the job will take just under 2 and 1/2 hours. Those completing the patch plate installation should be ready to clip to the bulkhead below. Home builders should be ready to use a tail stand to prevent the rear of the aircraft from striking the ground while work is performed.

 Accessing the deeper portion of the tailcone bulkhead will require additional, temporary plywood reinforcement to protect the skin between each rib during the install. Owners at least have a while to comply, with the work required "Within 100 hours or at the next 12-month inspection, whichever occurs first." For the full bulletin and step by step directions, see the Van's website below.

FMI: www.vansaircraft.com

Advertisement

More News

ANN's Daily Aero-Term (07.12.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (07.12.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Of the Aeropup and its Pedigree

From 2023 (YouTube Edition): Barking up the Right Tree Australian-born, the Aeropup is a remarkably robust, fully-customizable, go-anywhere, two-seat, STOL/LSA aircraft. The machin>[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC