STS-124 Crew Settles Into Life In Orbit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Jun 02, 2008

STS-124 Crew Settles Into Life In Orbit

Spends First Full Day Preparing For Monday Docking With ISS

The STS-124 crew members aboard space shuttle Discovery began their first full day in space Sunday, by inspecting the orbiter’s heat shield and preparing for their impending arrival at the International Space Station.

Crew members used the shuttle’s robotic arm to perform a limited inspection of Discovery's thermal shield and the leading edges of its wings. The purpose of this inspection was to ensure no damage occurred to the protective tiles during launch.

As ANN reported, a chunk of insulating foam from the shuttle's external fuel tank struck the underside of the orbiter at T-plus 3:30 during Discovery's launch Saturday afternoon. While mission managers seem largely unconcerned about any damage caused by the foam, the fact it happened at all should give mission managers some pause.

STS-124 was the first launch to utilize an "in-line" external tank, sporting built-in modifications intended to reduce the risks of catastrophic damage to the orbiter from chunks of insulating foam. Previous tanks used since Discovery's first Return to Flight mission in July 2005, following the 2003 loss of Columbia, featured a number of modifications intended to reduce foam shedding... but STS-124 was the first to use an external tank designed from the ground-up to incorporate such changes.

The new design includes a new protuberance air load (PAL) ramp design, and titanium O2 line support brackets... both measures intended to resist ice formation.

It's impossible to completely eliminate foam shedding, simply due to the (admittedly flawed) nature of the tank's design... though NASA believed they had the shedding problem largely resolved prior to Discovery's launch. That a large chunk still separated may prove disquieting, though NASA officials believe the foam hit the orbiter late enough in the launch phase -- during which atmospheric stresses are negligble -- to not pose a significant risk for catastrophic damage.

If required, the usual detailed inspection of the heat shield will be performed later in the mission after the Orbiter Boom Sensor System (OBSS) has been returned to Discovery. The OBSS is needed to perform a complete scan, but was stowed on the station during STS-123 to make room for the Kibo laboratory’s Japanese Pressurized Module in Discovery’s payload bay.

Discovery’s crew members extended the Orbiter Docking System Ring and checked out rendezvous tools in preparation for their arrival at the station.

In addition, the STS-124 astronauts checked out spacesuits they will use during the mission’s three scheduled spacewalks at the station and participated in media interviews with radio and television stations in Minneapolis, MN and Bryan, TX.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC