Successful Rocket Test Bodes Well For NASA Shuttle, Constellation Programs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Nov 03, 2007

Successful Rocket Test Bodes Well For NASA Shuttle, Constellation Programs

Two-Minute Test Accomplishes All Objectives

NASA's Space Shuttle Program successfully fired a four-segment reusable solid rocket motor Thursday, November 1 at a Utah test facility. The two-minute test provided important information for continued launches of the shuttle and for development of the Ares I rocket, a key component of NASA's Constellation Program that will launch the Orion crew vehicle on missions to the moon.

The static firing of the full-scale motor was performed at 1300 MDT at ATK Launch Systems Group, a Promontory, UT-based unit of Alliant Techsystems Inc., where the shuttle's solid rocket motors are manufactured. Preliminary indications are that all test objectives for shuttle and Ares I were met.

The test evaluation motor, or TEM-13, burned for approximately 123 seconds, the same time each reusable solid rocket motor burns during a space shuttle launch. The Reusable Solid Rocket Booster Project Office at NASA's Marshall Space Flight Center in Huntsville, Ala., manages these tests to qualify any proposed changes to the rocket motor and to determine whether new materials perform as well as those now in use.

"Full-scale static testing such as this is a key element of the 'test before you fly' standard and ensures continued quality and performance,"
said Jody Singer, deputy manager of the Shuttle Propulsion Office at Marshall.

One test objective was to demonstrate the thrust vector control system operation using only one of two hydraulic power units. The vector control, part of the flight control system, directs the thrust of the two solid rocket booster nozzles to control shuttle attitude and trajectory during liftoff and ascent. During a shuttle launch, both hydraulic power units run and provide backup power to thrust vector control actuators. The test with only one hydraulic power unit will validate the system's redundancy capability and operating performance data.

Another test objective was to measure the external sound or acoustics created when the motor ignites. More than 25 microphones were located near the motor to record the data from the firing. This information will be used to predict the motor's acoustic effects and aid in the final design of the launch structure for Ares I.

After final test data are analyzed, NASA will publish results for each objective in a report available later this year.

FMI: www.nasa.gov/shuttle, www.nasa.gov/constellation

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC