NASA's Space Launch System One Step Closer To 2017 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sun, May 25, 2014

NASA's Space Launch System One Step Closer To 2017 Flight

Test Demonstrates Key Structure's Max Load

NASA and ATK are one step closer to meeting a 2017 launch date for NASA's Space Launch System (SLS) after completion of a significant structural test of the booster's main attachment mechanism. NASA is developing SLS to take humans farther into deep space than ever before.

"We test like we fly," said Charlie Precourt, vice president and general manager of ATK's Space Launch Division, and former four-time space shuttle astronaut. "There are no second chances in spaceflight—we have to be certain we've got it right before we launch."

The article tested was a major load-bearing structure known as the forward skirt. The attach point on the forward skirt is where the main stage attaches to the five-segment solid rocket boosters that will launch SLS into deep space. ATK is providing the boosters as well as integration with the forward skirt.

The forward skirt is one of many critical components of the SLS booster design and must be tested to meet very demanding SLS requirements. For the test, ATK designed and fabricated a new test stand capable of applying millions of pounds of force to the structure.

Technicians tested the forward skirt at simulated lift-off and ascent conditions before testing it to failure. The final test demonstrated the structure's maximum load.

NASA's SLS booster program remains on track for a late 2017 launch. The booster critical design review will be held this summer.

(Image provided by ATK)

FMI: www.nasa.gov, www.atk.com

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC