NASA Defers Setting Next Shuttle Launch Date | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, Feb 22, 2009

NASA Defers Setting Next Shuttle Launch Date

Flow Control Valve Concern Requires More Study

During a thorough review of space shuttle Discovery's readiness for flight, NASA managers decided Friday more data and possible testing are required before proceeding to launch. Engineering teams have been working to identify what caused damage to a flow control valve on shuttle Endeavour during its November 2008 flight.

As ANN reported, NASA found one of those valves damaged in Endeavour after that shuttle's mission in November. As a precaution, Discovery's valves were removed, inspected and reinstalled. It's not clear yet what the nature of the problem is.

"We need to complete more work to have a better understanding before flying," said Bill Gerstenmaier, associate administrator for Space Operations at NASA Headquarters in Washington. Gerstenmaier chaired Friday's Flight Readiness Review.

"We were not driven by schedule pressure and did the right thing. When we fly, we want to do so with full confidence."

The shuttle has three flow control valves that channel gaseous hydrogen from the main engines to the external fuel tank. Teams also have tried to determine the consequences if a valve piece were to break off and strike part of the shuttle and external fuel tank.

The Space Shuttle Program has been asked to develop a plan to inspect additional valves similar to those installed on Discovery. This plan will be reviewed during a meeting on Wednesday, February 25. Afterward, the setting of a new target launch date may be considered.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC