New USAF Bomber Slated For 2022 Roll-Out | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, May 28, 2022

New USAF Bomber Slated For 2022 Roll-Out

Northrop-Grumman Reports B-21 Proceeding Apace in Ground-Testing

Northrop Grumman stated that the public unveiling of its next-generation stealth bomber, the B-21 Raider, is still expected later this year.

The aircraft—an advanced, very long-range, heavy-payload, stealthy, intercontinental strategic bomber—is an integral component of the U.S. Air Force’s Long Range Strike Bomber (LRS-B) program. When complete, the B-21 will be able to deliver conventional and/or thermonuclear ordnance to targets anywhere in the world.

Expected to enter service in 2026, the B-21 Raider is to complement existing Rockwell B-1 Lancer, Northrop Grumman B-2 Spirit, and Boeing B-52 fleets already in U.S. service, and eventually replace these bombers.

Currently, six B-21s are in production, with the first aircraft having completed a series of ground-tests at Air Force Plant 42 in Palmdale, California. Subject tests included critical load-calibration assessments which encompassed configuring the aircraft’s instruments and verifying its structural integrity. Subsequent ground-testing comprised powering up the bomber, assessing its subsystems, and applying protective coatings and paint.

Northrop plans to carry out engine runs, and both low and high-speed taxi tests before the B-21 departs on its maiden flight from Palmdale to Edwards Air Force Base, where formal flight testing will commence.

Northrop’s confirmation of a 2023 first flight imparts a degree of certainty to a program thus-far hampered by delays. Original hopes for a December 2021 first flight of the new bomber went unrealized, and both Air Force and Northrop officials have subsequently become more cautious in their statements.

FMI: www.af.mil, www.northropgrumman.com

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC