AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Sep 17, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-17-04

PRODUCT: Certain Airbus SAS Model A350-941 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-06-09, which applied to the aircraft listed above.

AD 2019-06-09 required repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, as specified in an EASA AD, which was incorporated by reference.

This new AD continues to require repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, and also requires modification of the baby bassinet inserts, which constitutes terminating action for the repetitive tightness checks; as specified in an EASA AD, which is incorporated by reference.

This AD was prompted by reports that baby bassinet inserts installed on airplane stowages and partitions were found loose because a self-securing fixation device (Loctite) had not been applied.

DATES: This AD becomes effective September 27, 2019. Comments must be received by October 28, 2019.

COST: The FAA estimates that this AD affects no affected U.S.-registered airplanes. If an affected airplane is imported and
placed on the U.S. Register in the future, operators may incur the following costs in order to comply with this AD:

Required Actions:

  • Retained actions from AD 2019-06-09: 1 work-hours × $85 per hour = $85.
  • New actions: Up to 3 work-hours × $85 per hour = Up to $255.

On Condition Costs:

  • Labor: 1 work-hour × $85 per hour = $85.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (07.12.25): Secondary Radar/Radar Beacon (ATCRBS)

Secondary Radar/Radar Beacon (ATCRBS) A radar system in which the object to be detected is fitted with cooperative equipment in the form of a radio receiver/transmitter (transponde>[...]

ANN's Daily Aero-Linx (07.12.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Of the Aeropup and its Pedigree

From 2023 (YouTube Edition): Barking up the Right Tree Australian-born, the Aeropup is a remarkably robust, fully-customizable, go-anywhere, two-seat, STOL/LSA aircraft. The machin>[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC