1000 Hours And Counting For Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.07.24

Airborne-NextGen-10.08.24

Airborne-Unlimited-10.02.24

Airborne-AffordableFlyers-10.03.24

Airborne-Unlimited-10.04.24

Sat, Jun 19, 2010

1000 Hours And Counting For Dreamliner

Flight Testing Passes The Millennium Mark, Nearly Halfway Complete

The Boeing 787 Dreamliner flight test fleet passed 1,000 hours of testing Thursday. The program estimates that it is about 40 percent through the test conditions required to certify the first version of the all-new jetliner.

"More work remains but we are seeing excellent progress in flight test," said Scott Fancher, vice president and general manager of the 787 program for Boeing Commercial Airplanes. "Even more important than the hours we've logged are the test conditions we have completed. The team is being very efficient in getting the data we need."

"It's also important to note that we are making solid progress on the ground testing required on the flight test fleet as well," Fancher said.

FMI: www.boeing.com


Advertisement

More News

Aero-TV: Sonex Displays Two-Seat Aerobatic Prototype

Model Combines Lightweight Design with Pilot Comfort Sonex Aircraft showcased its first two-seat aerobatic prototype at this year’s EAA Oshkosh Airventure. Though it has not >[...]

Aero-News: Quote of the Day (10.07.24)

“Dynon is committed to enhancing flight safety and reducing pilot workload. We’re thrilled to expand the SkyView HDX Autopilot to Mooney M20J and M20K pilots. This adva>[...]

ANN's Daily Aero-Term (10.07.24): ARTS IIIA

ARTS IIIA The Radar Tracking and Beacon Tracking Level (RT&BTL) of the modular, programmable automated radar terminal system. ARTS IIIA detects, tracks, and predicts primary as>[...]

ANN's Daily Aero-Linx (10.07.24)

Aero Linx: General Aviation Safety Council (GASCo) GASCo was founded in 1964 to provide a forum in which all of the General Aviation organisations could meet to share safety inform>[...]

ANN's Daily Aero-Term (10.08.24): Blind Spot

Blind Spot An area from which radio transmissions and/or radar echoes cannot be received. The term is also used to describe portions of the airport not visible from the control tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC