Boeing Submits Proposals For Ares V Design Support | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Feb 19, 2009

Boeing Submits Proposals For Ares V Design Support

Includes Bids For Payload Shroud, Departure Stage, And Avionics

Boeing announced this week its Space Exploration division recently submitted a slew of proposals to NASA for the Ares V Phase 1 Design Support Contracts.

Boeing submitted proposals for design support of the Ares V cargo launch vehicle's payload shroud, which will protect the Altair lunar lander during launch; the Earth-departure stage; the core stage, a liquid-fueled central booster element; and avionics and software. The work includes assessing requirements, risks and opportunities; performing trade studies and analysis; and producing final reports.

The company proposes to use the experience of its Huntsville-based team, supplemented by expertise from across Boeing, to develop products that will enable NASA to verify the Ares V design concept and demonstrate that the launch vehicle can meet its mission objectives.

"Boeing has designed and produced shrouds for Delta, Sea Launch and Titan rockets, and we've defined avionics and subsystem architectures across a wide range of aerospace products, including Delta, the space shuttle, the International Space Station and Ares I," said Jim Chilton, Boeing vice president of Exploration Launch Systems. "We're pleased to have the chance to bring this experience to NASA and Ares V."

The two-stage, vertically stacked Ares V will serve as NASA's primary rocket for delivery of large-scale hardware to space -- from the lunar landing craft and materials for establishing a moon base to food, water and other staples needed to extend a human presence beyond Earth's orbit.

The Ares V Phase 1 contracts will be managed out of NASA's Marshall Space Flight Center in Huntsville, AL.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC