NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Mon, Jul 06, 2015

NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR

Capability Will Extend E-2D Advanced Hawkeye Flight Endurance

The U.S. Navy and Northrop Grumman have successfully conducted the critical design review (CDR) for the E-2D Advanced Hawkeye Aerial Refueling (AR) system.

"The AR team continues to put outstanding effort into bringing this much needed capability to the E-2D Advanced Hawkeye," said Capt. John Lemmon, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231). "Aerial Refueling will enable the E-2D Advanced Hawkeye to provide longer on-station times at greater ranges."

Under a $226.7 million engineering, manufacturing and development (EMD) contract awarded in 2013, Northrop Grumman is designing, developing, manufacturing and testing several sub-system upgrades necessary to accommodate an aerial refueling capability.

Approval of this critical milestone demonstrates design maturity and acknowledgement that the program is ready to transition to the build/test phase. CDR also moves the program closer to installing this capability on new production aircraft. The E-2D aircraft already in service will be retrofitted with the aerial refueling capability.

"Achieving this critical milestone moves the program one step closer to fielding this much needed capability to the Warfighter," said Jane Bishop, vice president, E-2/C-2 programs, Northrop Grumman.

Installation of the developmental Aerial Refueling subsystem and flight test instrumentation onto the E2D test aircraft will commence in the second quarter of FY2016 at Northrop Grumman's St. Augustine manufacturing facility. Flight testing for the AR-equipped E-2D test aircraft is planned for FY2017, with Initial Operational Capability (IOC) expected in FY2020.

(Image provided by Northrop Grumman)

FMI: www.northropgrumman.com, www.navy.mil

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC