AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Sep 28, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-19-20

PRODUCT: Certain Boeing Model 737-200, -300, -400, and -500 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-25-06, which applied to the aircraft listed above.

AD 2010-25-06 required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

AD 2010-25-06 also provided for an optional repair, which terminated the repetitive inspections. For airplanes on which a certain repair was done, AD 2010-25-06 also required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

This AD retains the actions required by AD 2010-25-06 and expands the inspection area. This AD was prompted by additional cracking found in areas not covered by the inspections in AD 2010-25-06.

DATES: This AD is effective October 31, 2018.

COST: The FAA estimates that this AD affects 67 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections - Up to 67 work-hours × $85 per hour = $5,695 per inspection cycle.
  • Repairs/replacements - Up to 76 work-hours × $85 per hour = $6,460* per aircraft

* All required parts are supplied by the operator. This cost is minimal, and the FAA has no way to determine what an operator would pay for these parts. The FAA has received no definitive data that would enable us to provide cost estimates for certain other repairs specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC