Airbus Military Launches C295W Aircraft With Enhanced Performance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jun 02, 2013

Airbus Military Launches C295W Aircraft With Enhanced Performance

New Series Available In 2014 Features Winglets And Upgraded Engines As Standard

Airbus Military has launched a new series of its best-selling C295 medium transport and surveillance aircraft – the C295W. Featuring winglets and upgraded engines as standard, the new model will provide operators with enhanced performance in all flight phases but is particularly aimed at those operating at “hot and high“ airfields where payload increases in excess of 2,200 pounds are promised.

In intelligence, surveillance and reconnaissance (ISR) roles such as airborne early warning (AEW) the enhancements will increase endurance by 30-60min and permit an operating altitude up to 2,000ft higher than now. The new features will also provide an overall reduction in fuel consumption of around 4% depending on configuration and conditions.

The C295W, assembled in Seville, Spain, is being offered to the market from now on and will be the standard version of the aircraft in all versions from the fourth quarter of 2014. Certification is expected in 2Q14.

Airbus Military is committing to the C295W following flight-trials with winglets fitted to its company development aircraft which showed positive results for a weight penalty of only around 90kg.

The engines are the Pratt & Whitney Canada PW127 turboprops which power all versions of the C295. New procedures recently certified by Canada and Spain permit operation in the climb and cruise phases at higher power settings at the discretion of the operator. As well as improved hot and high performance, the procedure improves operation over very high terrain such as the Andes or Himalaya mountains with only a minor influence on maintenance cost.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC