Reliable Production Key To F-22 Success | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Sep 20, 2004

Reliable Production Key To F-22 Success

Lockheed-Martin Calls Program Healthy, On Track

The Raptor industry team has reached a new level of program maturity with reliable production, solid performance and expanding capabilities, Lockheed Martin's Deputy Vice President for Business Development Rob Weiss said last week.

Speaking to reporters at the 2004 Air Force Association National Conference, Weiss said the F/A-22 program is healthy, solid and on track. He added that significant advances in production have been made over the past year, and aircraft committed for delivery in 2004 are completing production build according to schedule.

"We are delivering high-quality aircraft faster than ever before, meeting our 2004 commitment to the Air Force, and we have begun the initial stages of Raptor modernization," Weiss said. "We are excited that the Air Force's operational testing is nearing completion and look forward to a full-rate production decision."

F/A-22 modernization is a robust, long-term plan to inject emerging technologies and expand capabilities.

Weiss pointed out that the F/A-22's performance is exceeding requirements in key areas such as stealth, speed, agility and sensor systems performance at Edwards, Nellis and Tyndall Air Force bases, routinely demonstrating the Raptor's transformational war fighting capabilities.

The Air Force began F/A-22 Initial Operational Test and Evaluation (IOT&E) in late April 2004, and all indications are that IOT&E is proceeding well, although it is not expected to be complete until later this year. According to the Air Force, all scenarios scheduled to be flown are complete.

"In addition to evaluating data gathered during flight scenarios, the Air Force will use modeling and simulation tools to simulate flying operations and maintenance. The Air Combat Simulator in Marietta, Georgia, is being used for the Modeling and Simulation portion of IOT&E," Weiss said.

"The F/A-22 program is concluding development, ramping up for full-rate production and delivering superior jets to the Air Force," he said. "All the while we are working closely with the Air Combat Command to craft a prudent modernization 'flight plan' that will keep the Raptor on the cutting edge of survivability and lethality for decades to come."

FMI: www.lockheedmartin.com

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC