NASA Administrator Briefed On X-57 Mod II | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 16, 2019

NASA Administrator Briefed On X-57 Mod II

Bridenstine Visited Armstrong Flight Research Center Earlier This Month

NASA Administrator Jim Bridenstine got a firsthand look at the agency’s all-electric X-57 Maxwell in its first of three configurations as an electric aircraft, following the vehicle’s Oct. 2 delivery to NASA’s Armstrong Flight Research Center in Edwards, California.

Administrator Bridenstine and Deputy Administrator James Morhard were briefed by project managers, pilots, engineers, and NASA Armstrong center leadership as he inspected the aircraft in its current configuration called Modification II, or Mod II, which features the replacement of traditional combustion engines with electric motors. The administrator received updates as the team prepares the vehicle for Mod II ground systems testing, to be followed by ground taxi tests, and ultimately flight tests.

While Mod II proceeds towards testing, NASA is preparing for the project’s following Mod III phase, which will feature a new high-aspect ratio wing and repositioning of the electric motors to the wing tips, and Mod IV, the aircraft’s final configuration, which will feature the addition of 12 small, electric motors along the leading edge of the wing.

X-57 is NASA’s first all-electric experimental aircraft, or X-plane, which will feature a distributed electric propulsion system. The goal of the project is to help develop certification standards for electric aircraft, and to share the aircraft’s design and airworthiness process with regulators. The project includes a design driver technical challenge, including a 500% increase in high-speed cruise efficiency, zero in-flight carbon emissions, and flight that is quieter for communities on the ground.

(Image provided with NASA news release)

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Sikorsky UH60 Sikorsky UH-60

Sikorsky UH-60 Black Hawk Helicopter Collided With An Unregistered DJI Mavic 3T Unmanned Aerial Vehicle On July 7, 2025, about 1557 central daylight time, an unregistered Sikorsky >[...]

Aero-News: Quote of the Day (11.13.25)

“After considering the measures taken, minimum liquidity covenants in the Company's current debt obligations and cash flows to maintain current operational obligations requir>[...]

ANN's Daily Aero-Term (11.13.25): Ground Clutter

Ground Clutter A pattern produced on the radar scope by ground returns which may degrade other radar returns in the affected area. The effect of ground clutter is minimized by the >[...]

ANN's Daily Aero-Linx (11.13.25)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC