FAA SAIB: Gulfstream Flight Compartment Windows | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Dec 12, 2019

FAA SAIB: Gulfstream Flight Compartment Windows

Agency Has Received At Least 20 Reports Of Windshield Failures Since 2013

The FAA has released a Special Airworthiness Information Bulletin (SAIB) following reports of multiple windshield failures on  Gulfstream Aerospace Corporation G-1159A (G-III), G-IV, GIV-X, GV, GV-SP, and GVI airplanes.  It also provides information on a new windshield design that should be used if replacement of an existing windshield becomes necessary.

According to the SAIB, since 2013, the FAA and Gulfstream are aware of at least 20 incidents involving windshield failures.

The failures resulted in one or more of the following: arcing, cracking, smoke, and/or small fires. In some cases, this has resulted in diversions or emergency landings.

Gulfstream has designed and now manufactures a new windshield with an improved heater terminal block. Since the same windshields are common to multiple models of Gulfstream airplanes, in most cases these new windshields may be used as replacements.

For Pilots: The FAA recommends that because of potential difficulty determining which windshield ply is affected, if you experience a windshield cracking event, assume that a structural windshield ply is affected, and follow the appropriate airplane flight manual emergency procedure (G-1159A (G-III) and G-IV), or abnormal procedure (GIV-X, GV, GV-SP, and GVI), which includes pulling the associated windshield heat circuit breaker.

For Maintenance Personnel: The FAA recommends that when being replaced, use the new design windshields. These windshields have upgraded/redesigned terminal block part numbers:

  • Windshield (Left), 1159SCB5102-13
  • Windshield (Right), 1159SCB5102-15

(Image from file)

FMI: SAIB

Advertisement

More News

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

Classic Aero-TV: The PB4Y-2 Privateer - A Priceless Aero-Treasure

From 2015 (YouTube Version): Oshkosh Reveals Many Treasures... Including Old Warbirds Full Of History While at EAA AirVenture 2015, ANN News Editor, Tom Patton, ventured out to vis>[...]

Aero-News: Quote of the Day (07.14.25)

"The aircraft achieved the maximum recorded airspeed of 180 Knots IAS at about 08:08:42 UTC and immediately thereafter, the Engine 1 and Engine 2 fuel cutoff switches transitioned >[...]

ANN's Daily Aero-Term (07.14.25): Temporary Flight Restriction (TFR)

Temporary Flight Restriction (TFR) A TFR is a regulatory action issued by the FAA via the U.S. NOTAM System, under the authority of United States Code, Title 49. TFRs are issued wi>[...]

ANN's Daily Aero-Linx (07.14.25)

Aero Linx: Aviation Without Borders Aviation Without Borders, a leading humanitarian aviation charity, uses its aviation expertise, contacts and partnerships to enable support for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC