AD: ATR | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Apr 02, 2009

AD: ATR

AD NUMBER: 2009-07-05
MANUFACTURER: ATR
SUBJECT: Airworthiness Directive 2009-07-05
SUMMARY:
We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAIdescribes the unsafe condition as: Incomplete accomplishment instructions in SB [service bulletin] ATR 72-27-1059 original issue and Revision 1, failed to mention installation of cotter pins to secure he self locking nuts after re-installation of the modified Pitch Uncoupling Mechanism (PUM), when connecting the elevator control linkage rods to the PUM input levers and the PUM output rods to the elevator bellcranks (on both sides). Because of the non-installation of these four cotter pins, the fail-safe criteria of the design requirements on the pitch control are no longer met. Such a failure could cause the loss of one self locking nut and would result in the loss of pitch control on one side-Captain or First Officer-or the loss of control of one elevator surface.The symmetrical loss of two concerned self-locking nuts could lead to a complete loss of the pitchcontrol. * * * * * We are issuing this AD to require actions to correct the unsafe condition on these products.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC