Space Shuttle's Final Flight Tank Spliced Together | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Mar 04, 2010

Space Shuttle's Final Flight Tank Spliced Together

Tank Will Fly On STS-133 In September

As the Space Shuttle program winds down, we're going to see a lot of these kinds of stories over the next few months. The program's final flight tank - designated External Tank-138 - has completed a critical production milestone at the NASA Michoud Assembly Facility. The tanks are built by Lockheed Martin in New Orleans, where its engineers and technicians mechanically spliced ET-138's liquid oxygen (LO2)/intertank to the liquid hydrogen (LH2) tank, thus producing "a whole tank" for the first time in the production process.

The work is performed in Cell A in the 20-story-tall Vertical Assembly Building, and is the only time during production that the tank is standing upright. Workers also completed foam closeouts on the LH2 to intertank flange.

An External Tank is actually three components in one. The 54.6-foot-tall bullet-shaped LO2 tank sits at the top. The 22.5-foot-long intertank separates the LO2 tank and the LH2 tank and does not hold fuel. Unpressurized, the intertank serves as the forward attachment point for the Solid Rocket Boosters. The bottom vessel is the 96.7-foot-tall LH2 tank. The LO2 tank and intertank are already spliced together when they enter Cell A.

Lockheed Martin employees loaded the tanks into the cell and completed the splicing and laydown of the tank in a record 40 days. The prior eight tanks averaged 60 days in Cell A.

ET-138 now proceeds to the Final Assembly area for more processing and is scheduled for completion June 29. When ET-138 is delivered to NASA, it will be 15 stories tall (154 feet), nearly 28 feet in diameter, and weigh 58,500 pounds empty. When filled with 534,000 gallons of propellant on the launch pad, the tank will weigh nearly 1.7 million pounds. ET-138 is scheduled to launch with Space Shuttle Discovery (STS-133) on September 16 -- the final shuttle launch of the 29-year program. ET-138 will help propel Discovery to orbit and then separate from the shuttle 81/2 minutes post-launch after Main Engine Cut-off or MECO.

FMI: www.lockheedmartin.com, www.nasa.gov

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC