AD: Schweizer | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Jul 09, 2003

AD: Schweizer

AD NUMBER: 2003-13-15
MANUFACTURER: Schweizer
SUBJECT: Airworthiness Directive 2003-13-15


SUMMARY: This amendment supersedes an existing airworthiness directive (AD), applicable to Schweizer Aircraft Corporation (Schweizer) Model 269A, 269A-1, 269B, 269C, and TH-55A helicopters, that currently requires inspecting the lugs on certain aft cluster fittings and each aluminum end fitting on certain tailboom struts. Modifying or replacing each strut assembly within a specified time period and serializing certain strut assemblies are also required by the existing AD. This amendment requires the same actions as the existing AD, and also requires a one-time inspection and repair, if necessary, of certain additional cluster fittings, and replacement and modification of certain cluster fittings within 150 hours time-in-service (TIS) or 6 months, whichever occurs first. This amendment is prompted by the need to expand the applicability to include certain Hughes manufactured cluster fittings and to provide a terminating action for the repetitive dye-penetrant inspections of the cluster fittings. The actions specified by this AD are intended to prevent failure of a tailboom support strut or a cluster fitting, which could cause rotation of a tailboom into the main rotor blades, and subsequent loss of control of the helicopter.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20031315

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC