Fillmore VOR 'Extra Crispy': FAA Looking For Quick Fixes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Wed, Nov 05, 2003

Fillmore VOR 'Extra Crispy': FAA Looking For Quick Fixes

Fried Feds Working Hard To Compensate For VOR Lost In Wildfires

When the Southern California Consolidated Terminal Radar Control (SoCal Tracon) was forced to shut down a week and a half ago by wildfires raging dangerously close by, it caused massive but relatively short-term disruptions. Now the FAA is dealing with potentially much longer term disruptions caused when a heavily used radio navigation aid burned to the ground in one of the fires.

Fillmore VOR (FIM), located northwest of the Los Angeles basin, is the primary navaid for traffic from northern California and the Pacific Northwest heading into southern California.

It defines portions of two high-altitude jet airways and seven low-altitude Victor airways. The loss of FIM affects nine departure procedures at six airports, 10 standard arrival routes (STARs) at six airports, and 30 approach procedures at eight airports.

The FAA says the area has good radar and radio coverage, so controllers are vectoring air traffic along the route to compensate for the loss of FIM. There are no RNAV (GPS) STARs either in existence or planned that could be used to replace Fillmore VOR, and because of terrain and coverage issues, no other existing VOR signals could be used to compensate.

Longer term, the agency is trying to decide if it will put a mobile temporary VOR in Fillmore's place or rebuild the facility from the ground up. Not replacing the facility would require redesigning and flight-checking every affected procedure.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (11.06.25)

Aero Linx: The International Civil Aviation Organization (ICAO) The International Civil Aviation Organization (ICAO) is a United Nations agency which helps 193 countries to coopera>[...]

NTSB Final Report: Champion 7GC

About 25 Days (9.3 Hours) Before The Accident, The Airframe Was Modified With Different Landing Gear Legs, Wheels, And Brakes Analysis: The pilot reported that during the landing r>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Aero-News: Quote of the Day (11.06.25)

“Over 2025, Vertical has shown that when we set targets, we deliver. Whilst maintaining our industry-leading capital efficiency, we are not only demonstrating all piloted fli>[...]

ANN's Daily Aero-Linx (11.06.25)

Aero Linx: Air Medical Physician Association (AMPA) The Air Medical Physician Association (AMPA) is the largest professional organization of physicians dedicated to rotor wing (hel>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC