GE Celebrates 40 Years Powering Sikorsky's H-60 Black Hawk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.23.24

Airborne-NextGen-10.01.24

Airborne-Unlimited-10.02.24

Airborne-AffordableFlyers-10.03.24

Airborne-Unlimited-09.27.24

Sun, Nov 11, 2018

GE Celebrates 40 Years Powering Sikorsky's H-60 Black Hawk

Submits ITEP Final Proposal Revision

GE Aviation congratulates Sikorsky on the 40th anniversary of the Black Hawk. Sikorsky delivered the first H-60 Black Hawk, powered by GE’s T700 engine, on Oct. 31, 1978, to answer the U.S. Army’s call for a new helicopter and powerplant capable of significant performance and reliability improvements with reduced lifecycle costs. Today, more than 4,000 GE-powered Black Hawk aircraft of all types are in service worldwide.

To commemorate 40 years of powering Black Hawk mission success, GE held a UH-60M fly-in and corresponding ceremony at its Lynn, Mass., facility. “At the very heart of the UH-60 Black Hawk is the T700—a key component that enables Army pilots to complete their missions safely,” said Dana Fiatarone, Vice President of Army and Air Force Programs for Sikorsky. “Thank you to all those who touch the production of the T700 engine. You have been a fantastic partner to Sikorsky on the Black Hawk for many years. We do not take your role in the success of this aircraft lightly.”

Through continuous upgrades and technology advancements, GE has doubled the power of derivative engines in the T700 family over its lifetime and reduced its cost to the government by 50 percent.

Coincidentally, GE Aviation also submitted its final proposal revision (FPR) for the U.S. Army’s Improved Turbine Engine Program (ITEP) on Oct. 31. GE is offering its XT901-GE-900 engine for ITEP, the U.S. Army’s endeavor to re-engine its Sikorsky H-60 Black Hawks and Boeing AH-64 Apaches. The Army is also expecting the ITEP engine to meet Future Attack Reconnaissance Aircraft requirements for Future Vertical Lift (FVL). Army Contracting Command (ACC), based at Redstone Arsenal in Huntsville, Ala., plans to down select to one engine manufacturer for the Engineering and Manufacturing Development phase in the next few months.

“The success of the single-spool T700 over the past 40 years is a strong prediction for the future success of the single-spool T901 for ITEP,” said Harry Nahatis, Vice President of GE Aviation’s turboshaft engine business. “By using GE’s industry leading technologies, rather than mechanical complexity, the T700 has grown to keep pace with H-60 power demand without sacrificing reliability, lifecycle cost, and ultimately Warfighter readiness. Full modularity, only capable in a single-spool core design, offers superior growth potential at a lower cost through incremental improvements to engine modules.”

(Source: GE Aviation news release. Images from file)

FMI: Report

Advertisement

More News

ANN's Daily Aero-Term (10.02.24): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

Aero-News: Quote of the Day (10.02.24)

“NORAD aircraft flew a safe and disciplined intercept of Russian Military Aircraft in the Alaska ADIZ... The conduct of one Russian Su-35 was unsafe, unprofessional, and enda>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Air Tractor Inc AT-602

Airplane Was Flying West Along The North Edge Of The Field When The Outboard 3 Ft Of The Right Wing Impacted A Power Transformer On September 5, 2024, about 1014 mountain daylight >[...]

NTSB Prelim: Boeing A75L3

The Wreckage Was Located At The Base Of An Approximate 100 Ft Tall Tree On September 6, 2024, about 1259 Pacific daylight time, a Boeing A75L3, N53466, was substantially damaged wh>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC