White House Aero-Hit-List #2: Combat Search And Rescue (CSAR-X) Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Fri, May 08, 2009

White House Aero-Hit-List #2: Combat Search And Rescue (CSAR-X) Helicopter

$17 Billion Cut... But Trillions More Spent Elsewhere

The Obama Administration, in the process of spending trillions of dollars for all manner of programs and projects, is trumpeted the 17 Billion dollars it is trying to cut from the Federal Budget. Rather than try to digest them all en masse, we'll look at each of them one at a time and allow you to make up YOUR mind as to the rationale and wisdom for the decisions included below. Herewith; another of the programs on the chopping block that has an aviation or aerospace connotation.

From the 'Terminations, Reductions, and Savings' document published this week by the OMB, as part of the FY 2010 US Budget:

Proposal: The Administration proposes to terminate the Air Force Combat Search and Rescue (CSAR-X) Helicopter Program because of problems with contracting, high costs, and questions about the need for an aircraft solely devoted to this purpose when multi-purpose aircraft are available.

Justification: The Department of Defense is questioning the need for a single-purpose helicopter. Unlike the other services, which carry out this mission with multiple-purpose helicopters, the Air Force has traditionally carried out this mission with single-purpose aircraft. The Department will review the combat search and rescue mission in the context of multi-service requirements and capabilities.
Further, this program has experienced contracting problems that have led to delays and higher costs. A prime contractor was selected but, because of multiple protests by the losing contractors, the program has not begun development. The Congressional Budget Office, Government Accountability Office, and the Center for Strategic and International Studies (CSIS) all reported that faulty contracting actions would result in costly delays with no clear resolution. The original estimate for the program was approximately $11.5 billion. Funding in 2010 will be used for a requirements review and in support of the CSAR mission as determined in the Quadrennial Defense Review.

FMI: www.whitehouse.gov/omb/budget/fy2010/assets/trs.pdf

Advertisement

More News

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Introduces New 45-watt Charging Ports for 14- and 2>[...]

ANN's Daily Aero-Term (10.15.25): En Route Automation System (EAS)

En Route Automation System (EAS) The complex integrated environment consisting of situation display systems, surveillance systems and flight data processing, remote devices, decisi>[...]

Aero-News: Quote of the Day (10.15.25)

“Our Kodiak aircraft family is uniquely designed to meet the rigorous demands of such deployments, bringing short takeoff and landing performance, robust cargo capacity and e>[...]

ANN's Daily Aero-Linx (10.15.25)

Aero Linx: Australian Society of Air Safety Investigators (ASASI) The Australian Society of Air Safety Investigators (ASASI) was formed in 1978 after an inaugural meeting held in M>[...]

NTSB Final Report: Jeremy S Lezin Just SuperSTOL

Left Main Landing Gear Struck A Bush, And The Right Wingtip Impacted The Ground Analysis: According to the pilot of the tailwheel-equipped airplane, he noticed that the engine oil >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC