NASA Awards Contract To Restart RS-25 Development | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Nov 25, 2015

NASA Awards Contract To Restart RS-25 Development

Engines Will Power Agency’s Journey To Mars

NASA has selected Aerojet Rocketdyne of Sacramento, CA to restart production of the RS-25 engine for the agency's Space Launch System (SLS) and deliver a certified engine. SLS will use four RS-25 engines to carry the agency’s Orion spacecraft and launch explorers on deep space missions.

Part of NASA’s strategy to minimize costs of developing the SLS rocket was to leverage the assets, capabilities, and experience of the Space Shuttle Program, so the first four missions will be flown using 16 existing shuttle engines that have been upgraded.

Under the $1.16 billion contract, Aerojet Rocketdyne will modernize the space shuttle heritage engine for SLS. The contract runs November 2015 and continues through Sept. 30, 2024.

The new RS-25 engine developed under this contract will have fewer parts and welds and will be certified to a higher operational thrust level. The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays.

The contract restarts the firm’s production capability including furnishing the necessary management, labor, facilities, tools, equipment and materials required for this effort, implementing modern fabrication processes and affordability improvements, and producing hardware required for development and certification testing.

The contract also allows for a potential future modification that would enable NASA to order six flight engines.

NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the SLS Program for the agency. Engine testing will be performed at NASA’s Stennis Space Center in Mississippi and the SLS will launch from NASA's Kennedy Space Center in Florida.

(Source: NASA news release. Images from file)

FMI: http://www.nasa.gov/sls

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC