Successful First Flight For UAE's Initial PC-21 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Nov 28, 2010

Successful First Flight For UAE's Initial PC-21

Pilatus Delivers Military Trainer One Year After Signing The Contract

The initial flight of the first Pilatus PC-21 for the United Arab Emirates (UAE) Air Force & Air Defence took place Monday, one year to the day after the contract was signed.


Pilatus PC-21

Prior to first flight, the aircraft was rolled out and presented to the UAE Air Force & Air Defence by Oscar Schwenk, Chairman & CEO of Pilatus Aircraft Limited, in a ceremony attended by members of the Pilatus executive management and project teams from both parties.

After the roll-out, the aircraft's first flight was a ferry flight to the Buochs airfield. Pilatus' chief test pilot departed at 1034 local time on a flight which served as the final check for quality control and conformity. After engine checks on the runway, aircraft was taken to 10,000 feet, where an engine shut down and restart sequence is performed to prove the functionality of the engine related systems. Next, various mechanical systems are checked, including flight controls systems, airframe stall characteristics, engine performance and inverted flight. Finally the landing gear functionality was tested, the data was examined, and the aircraft prepped for the remaining production flight test.


Pilatus PC-21 Cockpit

A post flight debriefing was undertaken with the UAE Air Force & Air Defence, represented by Brigadier General Sami Saeed Al Nuaimi, and this formally closes this element of the project.

Delivery of the 25 PC-21 aircraft and the other key components of the Pilatus training system are scheduled to commence in the first quarter
2011.

FMI: www.pilatus.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC