AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Mon, Aug 12, 2013

AD: Airbus Airplanes

AD NUMBER: 2013-16-09

PRODUCT: All Airbus Model A318, A319, A320, and A321 series airplanes.
SUBJECT: Airworthiness Directive 2013-16-09
ACTION: Final rule; request for comments.

SUMMARY:  This AD requires an inspection to determine airplane configuration and part numbers of the landing gear control interface unit and main landing gear (MLG) door actuators; and, for affected airplanes, repetitive inspections of the opening sequence of the MLG door actuator, and replacement of the MLG door actuator if necessary.

This AD also provides optional terminating action for the repetitive inspections. This AD was prompted by a report of a MLG failing to extend during landing, and a determination that a certain configuration of landing gear control interface unit and actuators may result in masking of centralized fault display system messages that are necessary to mitigate risks associated with failure of MLG extension or downlocking.

The FAA is issuing this AD to detect and correct such a configuration, which could prevent the full extension or down-locking of the MLG, possibly resulting in MLG collapse during landing and consequent damage to the airplane and injury to occupants.

DATES: This AD becomes effective August 23, 2013. Comments on this AD must be received by September 23, 2013.

FMI: AD

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC