New C-27J Cargo Planes Stored In Arizona Boneyard | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Mon, Feb 03, 2014

New C-27J Cargo Planes Stored In Arizona Boneyard

Military 'Has No Use' For For The Spartans

New C-27J Spartan cargo planes ordered by the U.S. Air Force are being delivered ... directly to a storage "boneyard" in the Arizona desert. There are reportedly nearly a dozen new Spartans sitting on the ramp at Davis-Monthan AFB in Tucson, AZ.

The Dayton Daily News reports that the Air Force has spent some $567 million to acquire 21 new Spartans since 2007, but has found that the Air Force does not have missions for many of the aircraft.

The planes had originally been acquired because of their ability to operate from unimproved runways. But sequestration forced the Air Force to re-think the airplane's mission, and it determined that they were not a necessity, according to an analyst with the Project for Government Oversight.

The airplanes supported up to 800 jobs at Mansfield National Guard Base in Ohio, which led the state's congressional delegation to strongly support the continued acquisition of the airplanes, even though former Air Force Chief of Staff General Norton Schwartz said in a congressional hearing that the C-130 can do everything the C-27J can at nearly $100 million less per airplane.

President Barak Obama said during a campaign stop in Mansfield during the last election cycle said he promised to "find a mission" for the base there, which led to the transfer of several C-130 airplanes to Ohio.

But the C-27J Spartans are parked in the desert, and more are being built and delivered into storage. An Air Force spokesman said the program was "too near completion" to be able to terminate the program in a way that does not cost the taxpayers more than building the airplanes and sending them immediately to the boneyard.

(C-27J image from file)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC