FAA May Drop RVSM Application Requirement For Planes With ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Aug 09, 2017

FAA May Drop RVSM Application Requirement For Planes With ADS-B

Current Approval Process For Reduced Vertical Separation Minimum Authorization Would Remain In Place For Those Aircraft That Need It

The FAA is proposing to change the Reduced Vertical Separation Minimum (RVSM) authorization process by eliminating the need for U.S.-registered operators to apply for RVSM authorization when their aircraft meet altitude-keeping requirements and are equipped with qualified Automatic Dependent Surveillance-Broadcast (ADS-B) Out systems.

The FAA has been a major force in the implementation of RVSM since it was first introduced in 1997. RVSM reduced the vertical separation between aircraft above 29,000 feet from a minimum of 2,000 feet to 1,000 feet. This saves fuel and increases airspace capacity. RVSM airspace has now been implemented worldwide.

Currently, operators must prove their aircraft design satisfies RVSM performance requirements and that they have policies and procedures for the safe conduct of RVSM operations, before the FAA approves their RVSM authorization. Until recently, they also had to have a separate program to maintain RVSM systems and equipment. The FAA granted authorizations to operate in RVSM airspace only after finding that the pertinent requirements were met.

The proposed changes for RVSM authorizations would allow the FAA to leverage the technology in ADS-B Out systems to monitor altitude-keeping performance on RVSM-capable aircraft whenever they fly in U.S. ADS-B airspace. Properly equipped aircraft could conduct RVSM operations immediately, lowering costs and eliminating the delays associated with application processing. ADS-B becomes mandatory for aircraft operating in most U.S. airspace on January 1, 2020.

The current RVSM approval process would still be available for operators whose airplanes do not routinely operate in airspace where the FAA has sufficient ADS-B data to determine RVSM performance, or when a foreign country requires a specific approval.

(Source: FAA)

FMI: www.faa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC