FAA Official Concurs With Boeing Assessment On 737 MAX Return To Service | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jun 18, 2019

FAA Official Concurs With Boeing Assessment On 737 MAX Return To Service

Airliner Is Now Expected To Be Carrying Passengers Again In December

The FAA Associate Administrator for Aviation Safety said last week that the agency anticipates that the Boeing 737 MAX will be returned to revenue service in December of this year following two accidents which resulted in a total of 346 people five months apart.

Speaking at an aviation conference in Cologne, Germany last week, Associate Administrator Ali Bahrami said despite being "under a lot of pressure", the airplane will be returned to service "when we believe it will be safe," according to a report from Bloomberg. That will follow reviews of the design, flight testing and other checks. Given those conditions Bahrami said it would not be prudent to try to assign an exact date to the return to service, but that Boeing CEO Dennis Muilengurg's assessment that the airplane could begin flying again by the end of this year was likely accurate.

The FAA has previously said that there is no set time frame for a return to service for the 737 MAX, which has been grounded since March. U.S. airlines have been extending the removal of the airplane from their schedules. American Airlines Group and Southwest Airlines have cancelled all 737 MAX flights through at least September 3, while Bloomberg reports that United Continental Holdings may still be considering a resumption of flights in August.

In a separate interview, EASA Executive Director Patrick Ky has said that his agency is also assessing Boeing's proposed fix, and is considering whether to add additional simulator training for pilots and potential design changes.

Boeing has slowed production of the 737 MAX to 42 per month. The company had projected the manufacture of as many as 57 planes per month in the second half of this year.

(Image from file)

FMI: Source report

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC