AD: Saab AB, Saab Aeronautics Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 14, 2018

AD: Saab AB, Saab Aeronautics Airplanes

AD NUMBER: 2018-18-17

PRODUCT: Certain Saab AB, Saab Aeronautics Model 340A (SAAB/SF340A) and SAAB 340B airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-13-06, which applied to the airplanes listed above.

AD 2016-13-06 required a revision of the applicable airplane flight manual (AFM), repetitive inspections of the horizontal stabilizer de-icing boots, and applicable corrective actions. This AD continues to require a revision of the applicable AFM, repetitive inspections of the horizontal stabilizer de-icing boots, and applicable corrective actions.

This AD also requires replacement of single stitched de- icing boots with improved double stitched boots, and re-identification of the modified horizontal stabilizer leading edge.

This AD was prompted by reports of ruptured horizontal stabilizer de-icing boots.

DATES: This AD is effective October 18, 2018.

COST: The FAA estimates estimate that this AD affects 51 airplanes of U.S. registry.  

The actions required by AD 2016-13-06, and retained in this AD take about 6 work-hours per product, at an average labor rate of $85 per workhour. Based on these figures, the estimated cost of the actions that are required by AD 2016-13-06 is $510 per product.

In addition:

  • The FAA estimates that any necessary follow-on actions required by AD 2016-13-06, and retained in this AD take about 6 work-hours and require parts costing $9,500, for a cost of $10,010 per product. There is no way for the FAA to determine the number of aircraft that might need these actions.
  • The FAA also estimate that it would take about 6 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts would cost about $13,500 per product. Based on these figures, the estimated the cost of this AD on U.S. operators to be $714,510, or $14,010 per product.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC